TAXI!

Flashback | Friday, December 18, 2015 | United States



A historical look at welding operations inside the Checker Cab Manufacturing assembly line and the role of welding in early automotive production.

Flashback Department Header

image

September, 1940

For most of the 20th century, Checker Taxi Cabs serviced commuters and travelers in cities all over America. This view of the main assembly line at the Checker Cab Manufacturing Corp. in Kalamazoo, Michigan, shows the cab bodies in production and the welding operator fabricating a wheel house extension. This portion of the assembly included a 9-inch vertical weld using a 1/8-inch SMAW electrode, which took approximately 37 seconds per weld. One operator took care of the entire production, making two of these welds as well as several other small welds in various places on the body.

Have any vintage (pre-1975) photos you’d like to share? Email them in jpeg format to publisher@arcmagazine.pub with a date the photo was taken (actual or approximate), a brief description (three or four sentences), and an email address where we can reach you for additional information.

image