Welded. Brazed. Fabricated. Powered.

Built at Every Phase.

Data centers are being built faster than the trades can keep up. The contractors winning this work have figured out how to do more with the crews they have — through better processes, better equipment, and a supplier who covers the full scope of the job.

Lincoln Electric is that supplier. From the first structural column to the final cooling loop, we have the solutions for every phase of the build.

PHASE 1 — STRUCTURE PHASE 2 — FIT-OUT
PHASE 1 - INFRASTRUCTURE

Structural Steel Frame

Column splices, beam connections, moment frames, and bracing. High-volume fillet and groove welds on heavy sections.

PHASE 1 - INFRASTRUCTURE

Mezzanine & Platforms

Interior platforms, equipment mezzanines, and structural supports built into the building shell.

PHASE 1 - INFRASTRUCTURE

Engine Drives — Field Power

Portable welding power for construction sites where permanent power is unavailable.

PHASE 2 — FIT-OUT

Fire Suppression Piping

Sprinkler mains, branch headers, clean-agent systems, carbon steel and stainless piping.

PHASE 2 — FIT-OUT

Cooling Loop Piping

Chilled water, condenser water, and glycol piping. Home of Hyperfill® productivity gains.

PHASE 2 — FIT-OUT

Cable Tray & Grounding

Cable support fabrication, grounding rings, stud welding, and bonding applications.

PHASE 2 — FIT-OUT

Generator Exhaust & Fuel Systems

Exhaust stacks, silencer connections, diesel fuel distribution, carbon steel and chrome-moly piping.

PHASE 2 — FIT-OUT

HVAC & Precision Cooling

Ductwork, CRAC/CRAH units, refrigerant piping, and Harris® brazing solutions.

PHASE 2 — FIT-OUT

Transformer & Equipment Frames

Support structure fabrication for transformers, UPS systems, and switchgear.

● Phase 1 — Infrastructure Build ● Phase 2 — Fit-Out
DataCenterImage.png

Where The Work Is

Fabrication Points Across a Data Center Build

Hover over any point below to see the scope and Lincoln Electric's solution for that area of the job.

01

INFRASTRUCTURE BUILD

 

Building the Bones

Structural contractors are erecting steel and building the physical shell — often running multiple buildings simultaneously on compressed timelines. Their challenge is high volume at consistent quality, without enough experienced hands to go around.

• Column and beam connections — primary structural frame

• Embed plates welded into concrete foundation pours

• Joist, decking, and bracing connections

• Mezzanine structures and equipment platforms

• Curtain wall and cladding attachment framing

• Site civil — bollards, utility casings, drainage structures

• Field welding across open, active construction sites

02

DATA CENTER FIT-OUT

 

Making It Functional

Mechanical and systems contractors move in once the building is enclosed. Their scope is dense, technical, and sequenced — every system depends on the one before it. Pipe welding is the critical path, and speed per joint translates directly to schedule.

 

• Chilled water, condenser water, and glycol loop piping

• Cooling tower and chiller connections

• HVAC ductwork fabrication and field connections

• Copper refrigerant piping — brazed and soldered

• Generator exhaust stacks and fuel distribution piping

• Fire suppression mains and branch headers

• Cable tray, grounding rings, and equipment support frames

 
 
 
Lincoln Electric Solutions
Where We Make the
Biggest Difference
Two solutions that directly address the throughput problem on data center fit-out work.
FEATURED SOLUTION
Hyperfill®
Pipe Welding

 

In a data center fit-out, pipe welding is the critical path. Miles of large-diameter pipe need to be welded to exacting standards on a schedule that has no room to slip. Hyperfill's twin-wire process dramatically increases deposition rate on the fill passes that consume the most time — collapsing weld time per joint and compressing the mechanical schedule without changing the quality standard.

 

2×
Deposition rate vs. traditional single-wire process
 
FEATURED SYSTEM
PIPEFAB™
Welding System

 

The only welding system built from the ground up for pipe and vessel fabrication — root to cap. One machine runs STT® open-root, Pulsed MIG fill and cap, TIG, Stick, and Flux-Cored with no cable swapping. Cable View™ Technology monitors cable inductance in real time and adjusts the waveform automatically, so arc performance stays consistent no matter how cables are routed in a busy shop. Smart Pulse™ tailors the pulse waveform for the ideal arc on every pass.
 
 
55%
Increase in root pass productivity

 

50%
Reported production increase — Professional Piping Systems, LLC

 

<1hr
To train a new operator root-to-cap, passing visual inspection

 

1
Machine. Every process. No cable swapping.

 


Application Phase Lincoln Electric Solution
Structural steel fabrication Infrastructure Flux-cored & metal-cored wire, structural welding equipment
Field structural welding Infrastructure Engine drives — portable arc power for open-site column and beam work
Site civil welding Infrastructure Engine drives, stick electrodes
Production pipe welding — large diameter Fit-Out Hyperfill® twin-wire process
Pipe spool fabrication (shop) Fit-Out Wire solutions, plasma pipe cutting systems, positioners
HVAC ductwork and connections Fit-Out MIG wire, low-spatter processes for sheet metal
Cooling system piping (CS & SS) Fit-Out Wire, process, and consumable solutions for carbon and stainless
Generator exhaust & fuel piping Fit-Out Wire and process for carbon steel and chrome-moly
Copper refrigerant piping Fit-Out Harris® Stay-Silv® silver brazing alloys
HVAC coil and fitting connections Fit-Out Harris® phosphorus-copper brazing alloys
Electrical and low-pressure joints Fit-Out Harris® soldering products
Fire suppression piping Fit-Out Wire and process for black steel and stainless
Equipment support frames & raised floor Fit-Out MIG wire, structural processes
Grounding rings and equipment bonding Fit-Out Stud welding and arc welding solutions